|
 |
1. UNCRATING: Watch some
useful tips on removing your HCD machine from its shipping crate. |
|
 |
2.
ASSEMBLY 1: Adjusting the feet |
|
 |
3.
ASSEMBLY 2: Shipping collars |
|
 |
4.
ASSEMBLY 3: Control Panel |
|
 |
5. ASSEMBLY 4:
Thread stand |
|
 |
6. ASSEMBLY 5: Tubular
arms |
|
 |
7. THREADING: Installing
Thread Cones |
|
 |
8.
THREADING: Bobbin threading & tension |
|
 |
9. TENSION: Running a
tension test design |
|
 |
10.
TENSION: Adjusting upper tension based on tension test |
| |
|